Positioning & settling time
Indoors, on a level, load-bearing surface, with 20 cm clearance all around and no direct sunlight or heat source. Attach to the ground before commissioning. Important after transport: leave at least 30 minutes, before cooling 4 to 5 hours. Only then switch on.